Multi-Site Water Facility Assessment Program

Standardized UAV aerial photogrammetry and LiDAR mapping across 18 regional water treatment plants to deliver unified existing-condition basemaps, asset inventory databases, and Civil 3D engineering deliverables in approximately one week.

Facilities Assessed
18 Sites
Delivery Time
~7 Days
Geographic Scope
State Wide
CAD Deliverables
100% Civil 3D
Sky Shot — Aerial LiDAR & UAV Case Studies
CASE STUDY // 03

Multi-site water facility assessment program

Timeline delivered ~1 week
Facilities assessed 18 sites
Geographic scope Regional network
Core output CAD & Facility DB
18 Regional Facility Plants
Regional Water Treatment Facility Aerial Documentation
PROGRAM: 18 WATER PLANTS NETWORK ALL 18 SITES UNIFIED
STANDARDIZED FACILITY BASEMAPS High-resolution aerial digital baseline for plant upgrades and chemical storage.

01. Challenge

A regional infrastructure improvement program required preliminary engineering assessments across 18 water treatment facilities distributed over a wide geographic area.

Legacy site documentation was incomplete or outdated. Engineers needed rapid, standardized existing-condition data for each plant—including tanks, chemical systems, structures, access roads, and operational boundaries—before initiating design.

02. Method

Sky Shot established a standardized UAV aerial mapping and site documentation workflow across all 18 facility locations. Aerial imagery was captured at low altitudes to maximize surface detail for plant equipment and structural footprints.

Standardized QA: Aerial Inspection vs. Civil Site Plan
Water Plant Equipment Aerial View PLANT AERIAL ASSET VIEW
Ultra-detailed structural footprint of clarifiers, pump stations, & tanks.
Standardized Digital Facility Basemap DIGITAL TWIN BASELINE
Unified coordinate framework applied across all 18 municipal plants.

QA/QC & Accuracy Methodology

Each facility survey incorporated ground-verified checkpoints and regulatory record cross-referencing. Geospatial data across all 18 sites were unified under a single QA/QC protocol to guarantee consistent CAD layer structures and coordinate positioning.

03. Deliverables

A standardized, multi-site engineering package was provided for the entire program:

18x
Standardized Site Basemaps CAD drawings ready for engineering expansion
.PDF
Site Inspection Packages Georeferenced photo logs and condition reports
.DWG
Civil 3D Boundaries Tanks, chemical systems, & road alignments
.GIS
Regional Geodatabase Unified enterprise GIS layer for all facilities

04. Results

In approximately 1 week, the engineering team received complete, standardized site packages for all 18 facilities, eliminating weeks of preliminary site visits and drafting delays.

Multi-Site Program Velocity

18 SITES IN 7 DAYS
Traditional Individual Plant Visits 6–10 Weeks Travel & Drafting
INDIVIDUAL VISITS: 8 WEEKS
Standardized UAV Fleet Program 7 Business Days
UAV: 1 WEEK
  • Delivered 18 standardized plant site packages within 7 business days
  • Provided immediate design-ready CAD basemaps for program engineers
  • Established a verified digital baseline for multi-facility upgrades